|
Starting down to Placerville from Ridgway |
Future site of the Placerville siding |
The entrance to Vance Junction from Ridgway |
Partially completed roadbed in Telluride |
| The HomaBed roadbed is installed |
 |
 |
 |
 |
| |
|
|
|
|
|
Starting down to Placerville from Ridgway |
Looking back toward Ridgway from Placerville |
Hidden track from Placerville to Vance Jct. |
|
| Code 70 flex track is installed for the mainline |
 |
 |
 |
|
|
K-27 #455 starts her run in Placerville |
#375 pulls a train out of Placerville |
The train heads on up the grade toward Ridgway |
End of the line at Ridgway |
| The first trains run! |
 |
 |
 |
 |
All photos above taken with a Nikon Coolpix 950 at 1600x1200 resolution, minimum
JPEG compression. They were downsampled to 800x600 with Adobe Photoshop
6.0 and saved at JPEG compression factors 7-9. Lighting is 5000 degree
fluorescent bulbs with the camera's white balance manually set from a bright
white sheet of paper.